Cost ranges (CSV) State labor index (CSV)
Unit prices
| Item | Unit | Range | Source |
|---|---|---|---|
| Vapor barrier (liner) installed | per sq ft | $2–$4 | HomeGuide, Jan 14, 2026 |
| Crawl space inspection | per job | $100–$250 | HomeGuide, Jan 14, 2026 |
| Sealing a foundation vent | each | $10–$22 | This Old House, Mar 13, 2026 |
| Crawl space access door | per job | $60–$150 | This Old House, Mar 13, 2026 |
| Crawl space dehumidifier, installed | per job | $1,000–$3,000 | HomeGuide, Jan 14, 2026 |
| Sump pump, installed (dirt floor) | per job | $600–$2,500 | HomeGuide, Aug 26, 2023 |
| Interior French drain in a crawl space | per ft | $20–$40 | HomeGuide, Feb 5, 2026 |
| Mold remediation (per affected sq ft) | per sq ft | $15–$30 | HomeGuide, Feb 5, 2026 |
| Removing old insulation | per sq ft | $1–$2 | HomeGuide, Jan 14, 2026 |
| Permit | per job | $100–$250 | This Old House, Mar 13, 2026 |
| Crack injection (epoxy / polyurethane) | each | $250–$800 | HomeGuide, Jul 9, 2025 |
| Structural crack repair (horizontal / stair-step) | each | $1,000–$5,000 | HomeGuide, Jul 9, 2025 |
| Steel push pier (piering / underpinning) | each | $1,000–$3,000 | HomeAdvisor, Jun 20, 2026 |
| Helical pier | each | $2,000–$4,000 | HomeGuide, Nov 21, 2025 |
| Mudjacking / slab jacking | per sq ft | $4–$9 | HomeGuide, Nov 5, 2025 |
| Polyjacking (foam) | per sq ft | $8–$25 | HomeGuide, Nov 5, 2025 |
| Wall anchors | per ft | $80–$150 | HomeGuide, Oct 29, 2025 |
| Carbon fiber or steel straps | per ft | $85–$280 | HomeGuide, Oct 29, 2025 |
| Helical tiebacks | per ft | $300–$360 | HomeGuide, Oct 29, 2025 |
| Wall straightening (excavation) | per ft | $340–$550 | HomeGuide, Oct 29, 2025 |
| Interior perimeter drain (basement) | per ft | $40–$85 | HomeGuide, Feb 5, 2026 |
| Exterior drain / weeping tile | per ft | $30–$90 | HomeGuide, Feb 5, 2026 |
| Exterior waterproofing membrane | per sq ft | $4–$7 | HomeGuide, Jan 23, 2026 |
| Sump pump, installed | per job | $600–$2,500 | HomeGuide, Aug 26, 2023 |
| Pier & beam shimming and leveling | per job | $1,500–$10,000 | HomeGuide, Dec 19, 2025 |
| Pier & beam: pier reinforcement | each | $1,500–$3,000 | HomeGuide, Dec 19, 2025 |
| Pier & beam: beam replacement | each | $1,500–$4,000 | HomeGuide, Dec 19, 2025 |
| Floor joist replacement | each | $350–$1,000 | HomeGuide, Feb 6, 2026 |
| Structural engineer report | per job | $500–$3,000 | HomeGuide, Feb 6, 2026 |
| Permit | per job | $75–$150 | HomeGuide, Feb 6, 2026 |
State labor index
Hourly mean wage of construction laborers (SOC 47-2061), May 2025, by state, divided by the U.S. mean of $25.02 (U.S. Bureau of Labor Statistics, May 2025 estimates). We apply it only to the labor share of a job (50–70%, This Old House), so a state with a ratio of 1.20 raises a total by 10–14%. It is a proxy: contractors' prices also depend on demand, overhead and competition, which wage data do not show.
| State | Hourly mean wage | Ratio to U.S. | Effect on a total |
|---|---|---|---|
| Hawaii | $34.39 | 1.38 | +19% to +26% |
| Massachusetts | $34.05 | 1.36 | +18% to +25% |
| New Jersey | $33.84 | 1.35 | +18% to +25% |
| Illinois | $32.51 | 1.30 | +15% to +21% |
| California | $31.19 | 1.25 | +12% to +17% |
| Minnesota | $31.12 | 1.24 | +12% to +17% |
| New York | $29.89 | 1.20 | +10% to +14% |
| Rhode Island | $29.70 | 1.19 | +9% to +13% |
| Washington | $29.48 | 1.18 | +9% to +12% |
| Missouri | $29.26 | 1.17 | +8% to +12% |
| Alaska | $28.50 | 1.14 | +7% to +10% |
| Connecticut | $28.49 | 1.14 | +7% to +10% |
| Ohio | $28.03 | 1.12 | +6% to +8% |
| Wisconsin | $27.87 | 1.11 | +6% to +8% |
| Oregon | $26.79 | 1.07 | +4% to +5% |
| Pennsylvania | $26.12 | 1.04 | +2% to +3% |
| Indiana | $25.99 | 1.04 | +2% to +3% |
| Nevada | $25.98 | 1.04 | +2% to +3% |
| Michigan | $25.54 | 1.02 | +1% to +1% |
| North Dakota | $25.55 | 1.02 | +1% to +1% |
| District of Columbia | $25.11 | 1.00 | +0% to +0% |
| New Hampshire | $24.87 | 0.99 | -0% to -0% |
| Iowa | $24.80 | 0.99 | -0% to -1% |
| Montana | $24.80 | 0.99 | -0% to -1% |
| Vermont | $24.52 | 0.98 | -1% to -1% |
| Colorado | $23.96 | 0.96 | -2% to -3% |
| Idaho | $23.38 | 0.93 | -3% to -5% |
| Utah | $23.27 | 0.93 | -3% to -5% |
| Maryland | $23.24 | 0.93 | -4% to -5% |
| Nebraska | $23.25 | 0.93 | -4% to -5% |
| Delaware | $23.09 | 0.92 | -4% to -5% |
| Arizona | $23.03 | 0.92 | -4% to -6% |
| Maine | $22.98 | 0.92 | -4% to -6% |
| Tennessee | $22.10 | 0.88 | -6% to -8% |
| Kentucky | $22.04 | 0.88 | -6% to -8% |
| Kansas | $21.91 | 0.88 | -6% to -9% |
| West Virginia | $21.90 | 0.88 | -6% to -9% |
| South Carolina | $21.86 | 0.87 | -6% to -9% |
| Wyoming | $21.84 | 0.87 | -6% to -9% |
| North Carolina | $21.76 | 0.87 | -6% to -9% |
| Florida | $21.42 | 0.86 | -7% to -10% |
| South Dakota | $21.30 | 0.85 | -7% to -10% |
| Virginia | $21.00 | 0.84 | -8% to -11% |
| Oklahoma | $20.82 | 0.83 | -8% to -12% |
| Texas | $20.63 | 0.82 | -9% to -12% |
| Louisiana | $20.31 | 0.81 | -9% to -13% |
| Georgia | $19.96 | 0.80 | -10% to -14% |
| New Mexico | $19.93 | 0.80 | -10% to -14% |
| Mississippi | $19.38 | 0.78 | -11% to -16% |
| Arkansas | $18.87 | 0.75 | -12% to -17% |
| Alabama | $18.23 | 0.73 | -14% to -19% |
What the data does not show
- Local prices: all cost ranges are national.
- Your house: clearance, access, water and damage move real quotes.
- Brand or contractor differences.
Reuse is welcome with a link to this page.